We watched the first stage of clearance this morning; many lorry loads left the beach, most of the 2 massive piles that were outside Waves - the most obvious bits you can see on the webcam. A HUGE amount remains to be cleared though, stretching from there all the way to the pontoon. It's about 2-3 feet deep and 10 feet wide all the way. They've done well today, but it's far from finished. As you can see as well, the bridge is back in place after the JCB also created a new channel straight to the sea directly from the gully. Cloudy and cooling off now, we're told rain is on the way for the last 48 hours of our time here... Still, it's been as lovely and we've had a fab time as always.